The rate that moisture escapes from a slab depends on the concrete w c the density of the finish the ambient conditions above the slab and the moisture below the slab.
Vapor barrier below concrete slab.
If ground conditions require their use a 3 inch 75 millimeter layer of sand over the vapor barrier and under the concrete has been shown to reduce these problems.
For some tips on this see sullivan s corner.
Stego wrap 15 mil vapor barrier.
If heavy equipment will be operating on the vapor barrier or if the vapor barrier will be installed over an angular subbase a minimum of 15 mils is recommended.
Thin plastic like this is often called a vapor retarder meaning it slows the vapor down but doesn t stop it.
A below slab vapor barrier can also help prevent sub slab radon ingress.
Thick concrete samples having a w c 0 50 and sealed from below required 82 days for the vapor emission rate to reach 3 0.
When evaluating the performance qualities of vapor barriers as soil gas retarders be sure to check the radon diffusion coefficient of the material before you select it.
Florprufe vapor barriers gcp lied slab vapor barrier by professional concrete floor problems building under monolithic concrete slab 10 and 15 mil underslab vapor barrier concrete vapor barriers ers.
Their use should be avoided where ground moisture conditions permit.
Vapor barriers aggravate the problems of plastic and shrinkage cracking.
New generation vapor barriers made from the highest grade virgin polyolefin resins have been developed that are considered true below slab vapor barriers or concrete vapor blockers.
These 10 mil and 15 mil vapor barriers are very puncture resistant and will not break down over time creating a true moisture barrier between the sub grade and.
A much better approach is a true vapor barrier with characteristics that conform to the requirements of astm e 1745 standard specification for water vapor retarders used in contact with soil or granular fill under concrete slabs.
Their 15 mil vapor barrier also controls radon gas is resistant to hot cold temperatures resistant to soil chemicals pollutants and like i said allows virtually zero water vapor transmission up through the slab.
If you are going to seal an exterior slab find a sealer that transmits water vapor breathes.
In general place the concrete slab directly on top of the vapor barrier with the subbase below.
Most exterior slabs do not need a vapor barrier.
Many vapor barriers are synonymous with soil gas retarders in construction language.
One laboratory drying study indicated that 4 in.
Aci 302 1 which is an american concrete institute standard for slab construction was modified in the early 2000 s to reflect the change in the placement of the vapor barrier directly below the concrete if a low permeable membrane flooring was to be installed.